CASE STUDY
LONG-TERM PROTECTION OF BURIED STAINLESS STEEL WATER PIPELINES
Buried Coatings
Project Data
Location | Jeddah, Kingdom of Saudi Arabia |
Client | Ministry of Finance – Kingdom of Saudi Arabia |
Products | Denso Primer D™, Densopol 80HT™ Tape and Denso™ PVC Self-Adhesive Tape - both tapes applied with a 55% (double layer) spiral overlap |
Contractor | Saudi BinLadin Group Haramain Division |
Distributor | Rezayat Trading Company Ltd. |
Consultant | Dar Al Handasah |
Date | April 2021 |
Project Details
The Well of Zamzam first sprang 5,000 years ago and has been a precious source ever since, both physically and spiritually, for so many. The name of the well comes from the phrase Zome Zome, meaning “stop flowing”, a command originally repeated to contain the spring water. The well has historical importance, as, for thousands of years, thirsty pilgrims have relied on the well for drinking water and spiritual inspiration.
For the well to stay fully functional, over 5km of buried 8” diameter stainless steel pipelines required protection against corrosion. Based on the continued success of the Densopol™ Tape systems for the protection of buried pipes throughout the Middle East region for the last 25 plus years, the project consultant selected it as the best option for this prestigious project.
The route of the pipelines from the Zamzam well to the water factory is a busy one running beside and between many main roads.

LONG-TERM PROTECTION OF BURIED STAINLESS STEEL WATER PIPELINES - NEW ZAMZAM LINE

Pipeline with fully applied system to the right, pipeline on the left with Denso Primer D

Pipeline with fully applied system to the left, pipeline on the right is prepped for application

LONG-TERM PROTECTION OF BURIED STAINLESS STEEL WATER PIPELINES - NEW ZAMZAM LINE

Pipeline with fully applied system to the right, pipeline on the left with Denso Primer D