Denso Steelcoat Systems are divided into 4 categories which involve different surface preparation
.i.e. Categories A,B, C, and D.
For a summary of these categories please go to the bottom of this page or click here
Surface Preparation
|
Protecting:
|
Steelcoat Systems
|
Expected Service
Life (years) |
Average Thickness
(Microns) |
|
Steel Structures
rigs, new jetty piles,
decking, walkways,
ramps, loading
installations,
very hot pipes
plant, tanks, pipelines,
cranes, bridges,
steelcoat |
|
|
|
|
process plant,
pipe bridges,
structural steel,
pipework,
fittings,
pipelines,
tie bars,
storage tank bases,
metal roof purlins,
hot pipework |
|
|
4-500
1600
1600
1400
1250
2300
(55% overlap)
|
|
cold/damp pipes,
badly rusted/pitted
pipes and
structural steelwork,
fittings,
pitted pipelines,
old metal roof sheets
|
|
|
|
|
pre-stressing and
post tensioning
bridge cables and
anchorages |
|
50 plus |
sleeve/anchorage
completely filled |
Note:
Preparation of galvanized steel and aluminium surfaces
Degrease and roughen surface by mechanical abrasion or abrasive sweep blasting.
Apply Denso Galvprime in accordance with the application instructions.
Apply two coats of Denso S.T. Epoxy in accordance with the application instructions. |
|
|
| |
|
|
| |
Category A |
Abrasive blast cleaning |
|
|
Standard: Sa2½
Surface profile: 50-75 microns |
| |
|
|
Category B |
Fresh water wash down followed by a thorough hand/power tool cleaning |
| |
|
Standard: St2 |
| |
|
|
|
Category C |
Fresh Water wash down, heavy chipping hammers to remove heavy rust, thorough |
| |
|
hand wire brushing to remove all loose scale and old coatings(conditions where St2 mechanical cleaning is not fully achievable due to condensation, deep pitting etc). |
| |
|
|
| |
Category D |
No cleaning required - new cables |
| |
|
|
|
|
Detailed Surface Preparation Data must be referred to. |
| |
|
|
|